On May 10, we managed to finish the hole for the lowest concrete foundation with an excavator. As you can see, a lot of complex shutterings are needed to build the special forms of the Kalachakra Stupa foundation. This preparation took us two more days and today we filled in the first concrete.

Today, we also painted the Tsatsas for the filling of the foundation.