Second Step of Concrete Stupa Foundations
May 15th, 2010, in stupa news
Today, in a second step, we build a square shuttering with nine boxes. These little squares will be filledaccording to the traditional Buddhist texts with Tsatsas and so on.
At the same time, we already prepared a shuttering (on the first two pics) for the socket, which will be build later on.
